Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Arboleda, C A and Abraham, D M (2004) Fatalities in Trenching Operations—Analysis Using Models of Accident Causation. Journal of Construction Engineering and Management, 130(02), 273–80.

Barker, R, Childerhouse, P, Naim, M, Masat, J and Wilson, D (2004) Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design. Journal of Construction Engineering and Management, 130(02), 177–87.

Chan, A P C, Chan, D W M, Chiang, Y H, Tang, B S, Chan, E H W and Ho, K S K (2004) Exploring Critical Success Factors for Partnering in Construction Projects. Journal of Construction Engineering and Management, 130(02), 188–98.

Choi, H, Cho, H and Seo, J W (2004) Risk Assessment Methodology for Underground Construction Projects. Journal of Construction Engineering and Management, 130(02), 258–72.

Hadikusumo, B H W and Rowlinson, S (2004) Capturing Safety Knowledge Using Design-for-Safety-Process Tool. Journal of Construction Engineering and Management, 130(02), 281–9.

Hegazy, T, Elhakeem, A and Elbeltagi, E (2004) Distributed Scheduling Model for Infrastructure Networks. Journal of Construction Engineering and Management, 130(02), 160–7.

Jeong, H S, Abraham, D M and Lew, J J (2004) Evaluation of an Emerging Market in Subsurface Utility Engineering. Journal of Construction Engineering and Management, 130(02), 225–34.

Lingard, H (2004) Work and Family Sources of Burnout in the Australian Engineering Profession: Comparison of Respondents in Dual- and Single-Earner Couples, Parents, and Nonparents. Journal of Construction Engineering and Management, 130(02), 290–8.

Lu, M and Anson, M (2004) Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects. Journal of Construction Engineering and Management, 130(02), 216–24.

Sacks, R, Eastman, C M and Lee, G (2004) Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete Industry. Journal of Construction Engineering and Management, 130(02), 206–15.

Shohet, I M and Perelstein, E (2004) Decision Support Model for the Allocation of Resources in Rehabilitation Projects. Journal of Construction Engineering and Management, 130(02), 249–57.

Stewart, J, Minchin, R E, Jaselskis, E J, Dayal, V and Smith, G (2004) Potential Construction Applications for Thermoset Composite Scrap Material. Journal of Construction Engineering and Management, 130(02), 199–205.

  • Type: Journal Article
  • Keywords: Composite materials; Recycling; Plastics; Ceramics; Construction materials; scrap metal; recycling; composite materials; ceramics; construction components; building materials; plastics; civil engineering;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(199)
  • Abstract:
    Thermoset composites are types of advanced plastics that perform well in high temperatures and pressures, can achieve tensile strengths similar to carbon steel, and have suitable electrical resistance properties. Because of these characteristics, engineers are increasing their use in the designs of both mechanical and electrical products, thus increasing the amount of thermoset scrap material sent to landfill sites (estimated to be approximately 1.2 billion kg per year (920,000 t). As a way to reduce the amount of this scrap material taken to landfill sites, possible construction applications are being investigated. Using American Society of Testing and Materials standards, a better understanding of its material properties are being explored, such as strength, density, uniformity, chemical resistance, and impact resistance. One potential application, developed and tested for its suitability as a construction material, was as a flooring substitute for traditional ceramic tile.

Zhang, X (2004) Concessionaire Selection: Methods and Criteria. Journal of Construction Engineering and Management, 130(02), 235–44.

Zheng, D X M, Ng, S T and Kumaraswamy, M M (2004) Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization. Journal of Construction Engineering and Management, 130(02), 168–76.

Zwick, D C and Miller, K R (2004) Project Buyout. Journal of Construction Engineering and Management, 130(02), 245–8.